It has been a while since my previous posts. I am in the planning stages of some Unity Connection 7.0 labs. While they are still very much on the drawing board, the basic concept will be to take three CUCME locations and provide a centralized Unity Connection solution.
For some future planning purposes, I am changing some of the dial plan and IP addressing. As a result, while the previous CUCME-CUE labs will be helpful for reference, these labs will deviate a bit from the structure in those previous labs.
I am probably a week or two out before I start posting. I need to finish building my LDAP/AD directory and test out installing Unity Connection in VMWare ESX. Below is a teaser of the topology that I am developing.
Tuesday, May 5, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment